Y-LIFT

y lift hebel

The Y-Lift Installation System has been safety tested and certified to a lifting height of 13 metres, it eliminates many OH&S issues while also increasing speed and efficiency. This adds up to reduced costs in both time and labour for the builder, especially on Party Wall and Boundary Wall Multi-Residential Developments.

INDIVIDUAL TITLES FOR LOTS

Builders can now sell lots on it own titles for Multi Residential developments

MULTI HIGH RISE BUILDINGS

Hebel 600mm panels can be used on multi-story buildings (up to 5 story) resulting in less joins, screws and glue.

4X FASTER THAN MAN-HANDLING PANELS

Hebel installation is completed by one operator on the ground and two Hebel Installers in half the time, resulting in minimal physical labour.

NO SCAFFOLDING

For Boundary Walls no scaffolding is required thus resulting in cost savings and flexibility

TESTED AND CERTIFIED

The Y-Lift Hebel System has been awarded a Certificate of AS 4804 compliance, and has been mechanically tested by an Australian Independent NATA accredited organization.

EFFICIENT LOGISTICS

Powerwall Solutions manages its in-house Hebel Installers for large scale residential developments efficiently with minimal down time.

Contact us now for a quote

AAC Panel Installers, Melbourne, Australia.